Just a few minor updates that don't actually need a full story. But worthwhile reading I think.
December 2009 the AC being installed on both platforms at City Thameslink will go live and all traction change will take place there instead of Farringdon. This is because of Smithfield sidings being the place to store failed trains now Moorgate branch is gone.
Three 377/2 will return to Thameslink in 2011 as part of Key Output One for a 12 car train service. This is likely to be run as a fast to Bedford as all core station will be able to accommodate a 12 car Electrostar as well as Luton and Bedford. Although is seems some works is needed at St Pancras International.
TfL is to claim damages against Bombardier for the delays in delivering London Overground's new fleet of Class 378s.
Reports are that during 2011 the Sevenoaks service will return to Southeastern with First Capital Connect running a new Tonbridge via Bromley South, Orpington, Sevenoaks and Hildenborough service. First Capital Connect will also run a service from London Bridge to Dartford calling at St Johns and then split with all station services via both Lewisham/Welling and Sidcup/Crayford lines. Maps have already been given out to developers in the City although it carries the disclaimer “This map shows a indicative route network. The 2011 Thameslink train service is subject to further evaluation and consultation by the DfT, including an assessment of the levels of train service at and through London Bridge during the construction phase of the station”.
London Overground's new platforms at Stratford have officially opened today. The new high level platforms closure is to allow for conversion to DLR as part of its Stratford International extension.
Transport Secretary Geoff Hoon has been discussing getting Crossrail proposal back to Ebbsfleet for interchange with Eurostar and Southeastern's High Speed services as part of the overall Crossrail project. It has been stated that Reading is much more likely due to the electrification of the Great Western main line will improve the business case for Reading.